Roll Crushers
The power required was 0.8 I.H.P. per ton crushed in 24 hours. The capacity was 62½ tons per day for each set of 8 rolls, and the total cost, exclusive of lighting, breaking, and drying, was 3s. 10d. per ton. The crushed ore was roasted and chlorinated. The rolls have now been superseded by Krupp ball mills.
قرأ أكثر